Reality IMT supported a rail-construction team planning fiber-optic installation and Positive Train Control work across a large commuter-rail network. Engineers needed current visual information about access points, visible utilities, structures, signals, and right-of-way conditions before construction decisions and bids could be finalized.
A high-rail-mounted panoramic imaging system with GPS and inertial positioning was used to collect continuous corridor imagery during normal rail access. The data was processed and made available through a mapped web viewer so project stakeholders could review conditions, tag visible assets, and coordinate field resources from the office.



